Ezy Estimator 2010 Tips: Speed Up Your Estimating WorkflowEzy Estimator 2010 remains a useful estimating tool for contractors, builders, and independent estimators who need a straightforward interface and reliable cost calculations. If you’re still using this version, you can get a lot more done in less time by applying a few workflow improvements, configuration tweaks, and best practices. This article covers practical tips to speed up day‑to‑day estimating tasks, reduce errors, and make your data more reusable.
1. Clean and organize your estimate templates
A cluttered template slows you down every time you start a new job. Spend time cleaning and standardizing templates so you only see fields you actually use.
- Keep a master template: Create a single, well‑organized master template with commonly used sections (site prep, structure, finishes, services). Use it for all new estimates to avoid recreating structure each time.
- Remove unused items: Delete redundant cost items, obsolete materials, and contractor notes that aren’t needed in most jobs.
- Standardize naming: Use consistent item naming and abbreviations so search and replace is predictable.
- Save task‑specific templates: Maintain a small library of specialized templates (e.g., residential renovation, commercial fit‑out, landscaping) to avoid manual restructuring.
2. Build and maintain a reliable cost library
A well‑curated cost library is the backbone of fast estimating. The more accurate and accessible your unit costs, the quicker you can compose accurate estimates.
- Use unit pricing: Enter clear unit measures (m2, m3, lm, hr) and default units to avoid conversion headaches.
- Regular updates: Schedule quarterly reviews of material prices, labor rates, and supplier margins. Even simple price changes compound across items.
- Group commonly used assemblies: Create composite items (e.g., “bathroom refurbishment — standard”) that bundle labor, materials, and overhead so you can insert a full scope with one click.
- Tag items: Use categories and tags so you can filter and find items quickly (e.g., electrical, plumbing, external, internal).
3. Use keyboard shortcuts and UI tricks
Ezy Estimator 2010 is keyboard‑friendly. Learning a few shortcuts and habits can shave minutes off repetitive tasks.
- Learn navigation keys: Use Tab, Enter, and arrow keys to move between fields quickly rather than switching to the mouse.
- Duplicate rows: Instead of creating similar items from scratch, duplicate an existing row and adjust quantities or rates.
- Quick search: Use the built‑in search/filter in your cost library to jump directly to items. Save frequent searches as bookmarks if the version supports it.
- Collapse sections: Collapse non‑active sections to reduce scrolling and focus on the task at hand.
4. Automate calculations and margins
Manual calculations are slow and error‑prone. Let Ezy Estimator handle math, and standardize how margins and markups are applied.
- Set default margins: Configure your preferred margin/markup defaults for labor, materials, and subcontractors so they apply automatically.
- Use formulas consistently: If you have custom calculation fields (wastage, travel, plant hire), centralize formulas so they’re consistent across estimates.
- Round rules: Decide and apply rounding rules (e.g., round to nearest whole dollar) uniformly to avoid last‑minute manual edits.
- Overhead allocation: Automate overhead allocation as a percentage rather than distributing it manually to individual line items.
5. Improve quantity takeoff speed
Quantity takeoffs are often the most time‑consuming part of estimating. Reduce time with structured approaches and cross‑checking.
- Takeoff templates: For repetitive takeoffs (flooring, plaster, roofing), prepare standard checklists and unit rates so you can apply them quickly.
- Import tools: If you work with digital plans, use any available CSV/Excel import features to bring quantities straight into the estimate instead of typing each value.
- Cross‑check totals: Use subtotal checks and pivot views (if available) to validate that your takeoff totals match plan quantities.
- Simple macros: If your workflow allows exports/imports to Excel, create small macros to transform plan quantities into Ezy Estimator friendly formats.
6. Manage subcontractor quotes efficiently
Subcontractor pricing is a major source of delay and variation. Streamline how you collect, record, and compare quotes.
- Standard RFQ template: Provide subs with a standard request‑for‑quote format that matches your estimate structure to make their responses easier to import.
- Record versions: Keep a simple change log in the estimate notes for any subcontractor price changes, date received, and contact details.
- Compare view: Use side‑by‑side comparisons of multiple sub quotes to pick the best value and reason quickly.
- Allowances vs confirmed prices: Clearly flag provisional allowances that need confirmation to avoid underquoting.
7. Leverage notes, instructions, and conditional items
Documenting assumptions reduces rework and queries later in the project lifecycle.
- Assumption block: Add a standard “assumptions” section to each estimate that records scope boundaries, site conditions, and excluded items.
- Conditional items: Tag provisional or conditional items (e.g., “allowance for asbestos removal”) so they’re easy to find and update when final pricing arrives.
- Client instructions: Include short client‑facing notes when sharing estimates to explain key variations or exclusions.
- Internal comments: Use internal notes for team members (e.g., “verify electrical allowance with John”) and keep these separate from client documentation.
8. Exporting, reporting, and presenting estimates
Fast internal workflow matters, but you’ll also save time by producing client‑ready documents quickly.
- Use preset report templates: Configure a few report layouts (detailed, summary, client version) and reuse them rather than manually editing outputs.
- Clean formatting rules: Decide what fields are client facing (exclude supplier notes, internal rates) and set report options accordingly.
- Quick PDFs: Configure default PDF export options (cover page, signatures, branding) so producing a final bid is a single click.
- Breakdown views: Provide both a high‑level summary and a line‑item breakdown to help clients and decision makers review faster.
9. Backup, sync, and versioning
Losing an estimate or having multiple conflicting copies costs time. Use disciplined backup and version control.
- Central storage: Keep master estimate files in a central shared folder or company server and use one master copy for editing.
- Version numbering: Use a simple versioning convention (e.g., v1.0, v1.1, v2.0) and log changes in a revision history note.
- Regular backups: Export critical estimates weekly or before major revisions and store copies offsite or in cloud storage.
- Lock final versions: When an estimate is accepted, lock or archive that version so it’s preserved for reference.
10. Train your team and document workflows
Small consistent gains by everyone compound into big time savings.
- Short hands‑on sessions: Run 30–60 minute training sessions focused on the most used features and your company’s templates.
- Quick reference guide: Produce a one‑page cheat sheet with your shortcuts, common steps, and where to find key templates and tags.
- Peer review: Implement a quick review checklist so another estimator checks large bids for errors and missing items before submission.
- Continuous improvement: Collect feedback after each large job and update templates, assemblies, and processes to capture what worked and what didn’t.
Quick checklist to implement today
- Create a clean master template.
- Build 5 composite assemblies you use most.
- Set default margins and rounding rules.
- Prepare two report templates (client summary and detailed).
- Start a shared “price updates” log and update it quarterly.
Ezy Estimator 2010 can still be a fast, reliable estimating tool if you invest a few hours in organizing templates, automating repetitive tasks, and enforcing consistent processes. Small changes — consistent naming, reusable assemblies, and clear version control — will deliver the biggest time savings over the long run.